Blue Origin’s New Glenn rocket goes vertical on the launch pad
Blue Origin continued to prep for the maiden flight of its massive New Glenn rocket as it went vertical on the launch pad Thursday ahead of an upcoming hot fire test needed before a launch attempt that is targeting before the end of the year.
“Up we go! The steel launch table that New Glenn sits on weighs 1.7 million pounds (roughly 726 metric tons), including the clamps that connect to the vehicle’s aft ring,” the company posted on social media after the rocket was lifted into a vertical position at Cape Canaveral Space Force Station’s Space Launch Complex 36.
The integrated first and second stage of the rocket were mated earlier this month and made the trip from the integration facility to the pad overnight Wednesday.
Gone vertical. pic.twitter.com/pDn29X5itN
— Blue Origin (@blueorigin) November 22, 2024
“Another step towards launch,” Blue Origin CEO Dave Limp wrote on X. “The transport and lift operation relies on our Transporter Erector or TE, a structure that’s almost 300 feet long and 50 feet wide and weighs more than 4 million pounds.”
